Monday, 16 March 2009

10 Weeks To Reno

We finally rallied and had a work day on the car with Brent and Mark jr. Besides spilling about seven beers, here's what we did:
  • Painted the roll-cage.
  • Filled/bled the cooling system.
  • Installed the original tail lights.
  • Discovered our brakes are mush.
  • Confirmed our rear passenger wheel is floppy.
The big break we had this week was securing a loaner transport trailer from a friend of Mark sr. That is a huge relief!

No comments:

Post a Comment